Flight 1 Flight number
Jan-03 Date of Flight
C or P(14d) Cargo or Piloted(length of stay on surface in Earth days)
00.00 t Total in metric tons for flight
# Total number of that particular element
ID ID from ESDB, Release 91.1, May 1991, PSS Office (JSC-45107)
(* denotes either an element not found in ESDB or an element that existed in ESDB and sized for this particular manifest)
Science elements manifested by LMEPO shown in italics example - zgl-01
Name Name of element followed by the flight mass
Science elements manifested by LMEPO shown in italics Example - Geologic Field Tools

C.1 LUNAR FLIGHTS

LUNAR IOC

Initial cargo flight
Flight 1 Jan-05 C 28.87 t
# ID Name Flight Mass
1 ccl Payload Unloader 11.50
1 cclatt Unloader Attachments 6.30
1 upl25 Power System (25/12.5) 8.40
1 utl Communication Equipment 0.94
1 lsldemo* Cryotank Verification Unit 0.50
1 utlflare Flare Warning System 0.23
10 xs Spares 1.00

2nd cargo flight
Flight 2 Mar-05 C 29.41 t
# ID Name Flight Mass
1 hml1* Habitat Module 1 (Lunar) 22.91
1 hxlalk2 Airlock: 2 Person, Lunar 5.50
10 xs Spares 1.00

Crew checks out and occupies base
Flight 3 Jun-05 P (14d) 3.28 t
# ID Name Flight Mass
5 eel* EMU: Lunar 0.90
1 eelsp* EMU Spares 0.18
1 rul* Unpressurized Rover (RFCs) 0.70
1 hsl5-.5* Consumables (5 crew,14 days) 0.73
1 zgl-01 Geologic Field Tools 0.35
1 zgl-02 Geophysical Monitoring Station 0.12
3 xs Spares 0.30

2nd Crew carries out science objectives
Flight 4 Jan-06 P (14d) 5.20 t
# ID Name Flight Mass
5 eel* EMU: Lunar 0.90
1 eelsp* EMU Spares 0.18
1 hsl5-.5* Consumables (5 crew,14 days) 0.73
1 zgl-01 Geologic Field Tools 0.35
1 zal-01 Small Automated Telescope 0.20
1 zgl-03 Active Seismic Experiment 0.30
1 zgl-04 Geophysical Traverse Package 0.12
1 zgl-05 Lunar 10-meter Drill 0.02
1 zpl-01 Space Physics Drop-off Package 0.10
23 xs Spares 2.30

LUNAR NOC 1

Nuclear power and press. rover delivered
Flight 5 Jan-07 C 25.95 t
# ID Name Flight Mass
1 upl100 Power: Lunar Module (100 kW) 6.50
1 udlpdm* Power Management & Distribution 2.50
1 rpl6 Rover: Pressurized Lunar 6.50
1 rplcart* 25 kW Power Cart 6.00
1 rpltrlr* Experiment/Sample Trailer 3.45
10 xs Spares 1.00

Expanded habitation delivered
Flight 6 Mar-07 C 29.08 t
# ID Name Flight Mass
1 hml2* Habitat Module 2 (Lunar) 21.98
1 hxlalk2 Airlock: 2 Person, Lunar 5.50
1 zll-02 Habitat Analytical Lab Instruments 0.10
1 zll-03 Biomedical Lab I 0.50
10 xs Spares 1.00

Crew checks out expanded habitat and stays through lunar night
Flight 7 Jun-07 P (60 d) 9.43 t
# ID Name Flight Mass
6 eel* EMU: Lunar 1.08
2 eelsp* EMU Spares 0.36
1 hsl6-2* Consumables & Pallet (6 crew,60 days) 4.02
1 zgl-01 Geologic Field Tools 0.35
1 zal-01 Small Automated Telescope 0.20
1 zgl-03 Active Seismic Experiment 0.30
1 zgl-05 Lunar 10-meter Drill 0.02
1 zxl-01 Discretionary PI Science 0.30
28 xs Spares 2.80

LUNAR NOC 2

Deliver 1st part of Mars sim suite (different site)
Flight 8 Jan-08 C 19.25 t
# ID Name Flight Mass
1 upl25 Power System (25/12.5) 8.40
1 upl100 Power: Lunar Module (100 kW) 6.50
1 udlpdm* Power Management & Distribution 2.50
1 zgl-06 Telerobotic Rover 0.75
1 zxl-01 Discretionary PI Science 0.30
8 xs Spares 0.80

Deliver 2nd part of Mars sim suite
Flight 9 Mar-08 C 30.15 t
# ID Name Flight Mass
1 hml1* Habitat Module 1 (Lunar) 22.91
1 hxlalk2 Airlock: 2 Person, Lunar 5.50
1 utl Communication Equipment 0.94
8 xs Spares 0.80

Deliver rest of Mars sim suite
Flight 10 May-08 C 29.38 t
# ID Name Flight Mass
1 hml2* Habitat Module 2 (Lunar) 21.98
1 hxlalk2 Airlock: 2 Person, Lunar 5.50
1 zll-02 Habitat Analytical Lab Instruments 0.10
1 zll-03 Biomedical Lab I 0.50
1 zll-04 Plant & Animal Laboratory I 0.50
8 xs Spares 0.80

Delivery of MTV systems to lunar orbit
Flight 11 Jun-08
Mars sim crew
Flight 12 Jun-09 P (30d) 7.76 t
# ID Name Flight Mass
6 eel* EMU: Lunar 1.08
2 eelsp* EMU Spares 0.36
1 rul* Unpressurized Rover (RFCs) 0.70
1 hsl6-1*sim Consumables & Pallet (6 crew, 30 days) 2.22
1 zgl-01 Geologic Field Tools 0.35
1 zgl-02 Geophysical Monitoring Station 0.12
1 zgl-04 Geophysical Traverse Package 0.12
1 zgl-03 Active Seismic Experiment 0.30
1 zgl-05 Lunar 10-meter Drill 0.02
25 xs Spares 2.50

Mars sim support crew
Flight 13 Mar-09 P (90d) 14.48 t
# ID Name Flight Mass
6 eel* EMU: Lunar 1.08
2 eelsp* EMU Spares 0.36
1 hsl6-3* Consumables & Pallet (6 crew, 90 days) 5.84
72 xs Spares 7.20

C.2 MARS FLIGHTS

MARS IOC

Initial cargo flight
Flight 1 Jun-12 C 35.41 t
# ID Name Flight Mass
1 cxg Equipment: Offloading/Construction 5.75
1 upm100 Power: Martian Module (100 kW) 5.98
1 udlpdm* Power Management & Distribution 2.50
1 rpm6 Rover: Pressurized Mars 6.50
1 rpmcart* 25 kW Power Cart 6.00
1 rpmtrlr* Experiment/Sample Trailer 3.45
1 utlflare Flare Warning System 0.23
1 zgm-01 Mars Geology/Exobiology Equipment 0.56
1 zgm-02 Geo/Meteorological Monitoring Station 0.10
1 zgm-04 Geophysical Traverse Package 0.12
1 zgm-03 Active Seismic Experiment 0.30
1 zgm-05 Mars 10-meter Drill 0.02
1 zmm-01 Mars Advanced Meteorological Facility 1.00
1 zmm-02 Mars Balloons 0.20
27 xs Spares 2.70

2nd cargo flight
Flight 2 Jun-12 C 35.44 t
# ID Name Flight Mass
1 hmm1* Habitat Module 1 (Martian) 23.85
1 hxmalk2 Airlock: 2 Person, Martian 5.50
1 utm Communication Equipment, Martian 0.94
1 zlm-02 Habitat Analytical Lab Instruments 0.15
1 zlm-03 Biomedical Lab I 0.50
1 zxm-01 Discretionary PI Science 0.30
42 xs Spares 4.20

3rd cargo flight
Flight 3 Jun-12 C 35.35 t
# ID Name Flight Mass
1 hmm2* Habitat Module 2 (Martian) 25.50
1 hxmalk2 Airlock: 2 Person, Martian 5.50
1 upm25 Power: Mars PVA/RFC System (25 kW) 2.65
17 xs Spares 1.70

Crew checks out and occupies base
Flight 4 Jun-14 P (90d) 9.15 t
# ID Name Flight Mass
6 eem* EMU: Martian 0.67
2 eemsp* EMU Spares 0.22
1 rum* Unpressurized Rover (RFCs) 0.70
1 hsm6-3* Consumables & Pallet (6 crew, 90 days) 5.86
17 xs Spares 1.70

MARS NOC

1st cargo to new site
Flight 5 Jun-14 C 38.11 t
# ID Name Flight Mass
1 cxg Equipment: Offloading/Construction 5.75
1 upm100 Power: Martian Module (100 kW) 5.98
1 udlpdm* Power Management & Distribution 2.50
1 rpm6 Rover: Pressurized Mars 6.50
1 rpmcart* 25 kW Power Cart 6.00
1 rpmtrlr* Experiment/Sample Trailer 3.45
1 utlflare Flare Warning System 0.23
1 zgm-01 Mars Geology/Exobiology Equipment 0.56
1 zgm-02 Geo/Meteorological Monitoring Station 0.10
1 zgm-04 Geophysical Traverse Package 0.12
1 zgm-03 Active Seismic Experiment 0.30
1 zgm-05 Mars 10-meter Drill 0.02
1 zmm-01 Mars Advanced Meteorological Facility 1.00
1 zmm-02 Mars Balloons 0.20
54 xs Spares 5.40

2nd cargo to new site
Flight 6 Jun-14 C 38.14 t
# ID Name Flight Mass
1 hmm1* Habitat Module 1 (Martian) 23.85
1 hxmalk2 Airlock: 2 Person, Martian 5.50
1 utm Communication Equipment, Martian 0.94
1 zlm-02 Habitat Analytical Lab Instruments 0.15
1 zxm-01 Discretionary PI Science 0.30
74 xs Spares 7.40

3rd cargo to new site
Flight 7 Jun-14 C 38.15 t
# ID Name Flight Mass
1 hmm2* Habitat Module 2 (Martian) 25.50
1 upm25 Power: Mars PVA/RFC System (25 kW) 2.65
1 ismdemo* Mars ISRU Demo 2.30
58 hsl Consumables 5.80
19 xs Spares 1.90

4th cargo to new site
Flight 8 Jun-14 C 38.20 t
# ID Name Flight Mass
1 hmm23/ext* Lab/Storage Module 14.60
1 hxmalk2 Airlock: 2 Person, Martian 5.50
1 zlm-03 Biomedical Lab I 0.50
1 zlm-04 Plant & Animal Laboratory I 0.50
160 hsl Consumables 16.00
11 xs Spares 1.10

Long-duration Crew
Flight 9 Jun-16 P (600d) 9.69 t
# ID Name Flight Mass
6 eem* EMU: Martian 0.67
2 eemsp* EMU Spares 0.22
1 rum* Unpressurized Rover (RFCs) 0.70
80 hsl Consumables 8.00
1 xs Spares 0.10